Original Cloister Area Entrance from Front Street. (November 2002)
Original Cloister area -- includes exterior brick walls of interior passage. (November 2002)
Cloister area aerial view, taken from River Street Garage -- looking toward river. (December 2002)
Cloister Demolition (July 2003)
Cloister interior, facing Front Street, showing construction. Former Cathedral House hallway wall in process of removal. (August 2003)
Cloister entrance area construction, awaiting glass placement. Glass cloister roof partially visible. (August 2003)
Cloister entrance area with partial glass placement -- glass panels are double-glazed to prevent heat loss. (September 2003)
Cloister interior from second floor balcony (September 2003)
Cloister interior showing 2nd story balcony (September 2003)