This is a Progress Report and Photo-Essay about St Stephen's
"Fitly Framed Together" campaign and "Green Project".
Included are pictures showing various locations and components within the
project, and the way the area is being transformed as the project develops.
Each page shows one aspect of the project in various stages from the project
beginning (Fall of 2002) to the present.
Pages will be updated regularly through the project
completion. You may want to bookmark this page to make it easy to return
for regular updates.
Each page shows a series of "thumbnail" images
for the particular segment of the project, and an "enlarged" view.
A few enlarged images may take up to 30-60 seconds to load, depending on the
size and detail of the image,
and the speed of your connection. Thank you for your patience!
Click small images
to enlarge.
Place cursor over image to see Caption.
Some browsers may
only show up to 4-5 thumbnail images.
Use right/left arrows to
scroll through additional images.
When some pictures
are enlarged, a more detailed description may display below the picture.
Enlarged image displays BELOW the
row of "thumbnail"-sized images,
with Expanded Descriptions below the full-sized image.
Cathedral Sign -- Front Street
Original entrance to Cloister area from Front Street (Fall 2002)
Project Leadership -- see enlargement for list of names
St Stephen's School Sign
Original view of PA Garage building, back of Cathedral and Carriage House, taken from parking lot now occupied by the Second Street Parking Garage.
Original entrance to School from Cranberry Street parking lot. (November 2002)
Original entrance to PA Garage from River Street. (November 2002)
Project Leadership [ **List NAMES** ] Rev Malcolm MacDowell (Cathedral Dean), Jim Elliott, Carol Lopus (Head of School), ---, ---, ---, Vern McKissick (Architect), ---.