Improvements to Nave and Undercroft
Included within the scope of the Fitly Framed Together
project are improvements to the Nave and Undercroft. These include:
 |
Upgrading of the steam heat system. |
 |
Installation of an air circulation system, utilizing
 |
existing openings in the ceiling of the nave, and |
 |
new floor openings for ductwork, and |
 |
ductwork placed in the ceiling of the Undercroft to
channel air circulation. |
|
Click small images
to enlarge.
Place cursor over image to see Caption. |
Some browsers may
only show up to 4-5 thumbnail images.
Use right/left arrows to
scroll through additional images. |
When some pictures
are enlarged, a more detailed description may display below the picture. |
Enlarged image displays BELOW the
row of "thumbnail"-sized images,
with Expanded Descriptions below the full-sized image. |
Undercroft construction, showing ceiling-mounted ductwork (to serve the nave via floor vents) and new piping for the steam heat system. (July 2003)
Undercroft construction, showing ceiling-mounted ductwork (to serve the nave via floor vents) and new piping for the steam heat system. (July 2003)
|